Category Archives: TRIAD

TRIAD Dates Confirmed | 2017/18

1718 Confirmed TRIAD Dates

Winter 17/18 TRIAD dates The results of the 17/18 TRIAD season were today confirmed by National Grid: 1. Monday 11th December ’17 – SP35 2. Monday 5th February ’18 – SP36 3. Monday 26th February ’18 – SP37 Nationwide Utilities successfully notified clients of ‘high chance of TRIAD’ (our strongest …

Continue reading

Posted in TRIAD | Tagged , , , , , , | Leave a comment

TRIAD Season Ends | What Next? | 17/18

1718 TRIAD Peak Chart

TRIAD Season 17/18 Results The 17/18 TRIAD season has now concluded with a significant February finish, owed in the main part to the arrival of the Siberian weather dubbed ‘the beast from the east’ that resulted in a flurry snow and TRIAD notifications. The TRIAD refers to the three half-hour settlement periods with highest system demand between …

Continue reading

Posted in Demand Side Response, TRIAD | Tagged , , , , , | Leave a comment

LIVE Energy Data Tool | Strategic Procurement

EF-LIVE-Energy-Tool

Image: An excerpt of the Energy Falcon® tool Live Energy Forecasting What is it? With the growing importance to understand and review live energy forecasts, Nationwide Utilities have designed and introduced a tool which marries together with Strategic Procurement to present timely energy data. It provides live data for the following …

Continue reading

Posted in Capacity Market, Demand Side Response, Energy Management, Energy Procurement, TRIAD | Tagged , , , , , , , , , | 1 Comment

TRIAD Management | Benefits of TRIAD

TRIAD Week day

What are TRIADs? National Grid introduced the TRIAD (Transmission Network Use of System) system charge in an effort to reduce high peaks and system stress during the winter months. Large industrial users are able to dramatically reduce energy bills by avoiding consumption during peak periods.A TRIAD can be defined as …

Continue reading

Posted in Demand Side Response, TRIAD | Tagged , , , , , | 3 Comments